Platforms Designed as three separate modular pieces, these buildings were meant to be constructed individually and stacked on site when installed. WF built five such buildings, including handrails, ladders, and grating.
WF’s shop capabilities proved to be a differentiator. Overhead crane assembly at our shop rather than a module yard reduced costs and improved delivery times.
When late steel requirements were added to their scope, WF was able to slip extra work into the production line with our other work which was a great help in our schedule driven site work.
—Dave Collin, Construction Team Lead, GBU